Auxiliary Section:
Guidelines and Standards
Under Review

For copies of these drafts, please contact Jennifer Jones at 202/974-5231.



Guideline/Standard
Project Leader/Status
Conveyors B151.17:  Safety Requirements for the Construction, Care and Use of Integral Vacuum Loaders; Rotary Feeders; Compressed Air (pneumatic) Conveyors; Positive Displacement Pump Packages; Dust Collectors, Air Separators and Cyclones; Indoor Storage Vessels; Vacuum Receivers, and Actuated Valving; Vortex Blower; piping and couplings; Materials handling Fans; and Fines Separation Systems (Aspirator)
Leader:  Chuck Thiele, Motan, Inc.
Status:  Out for Ballot
Granulators B151.11: Granulators, Strand Pelletizers and Dicers Used for Size Reduction of Plastics Safety Requirements for Manufacture, Care and Use
Leader: Clifford Weinpel, Foremost Machine Builders
Status: Draft available for review/comment
Robots: Safety Requirements for the Manufacture, Use and Integration of Robots with Vertical Clamping Injection Molding Machines
Leader: John Vandenbergh, The Conair Group
Status: Available through ANSI/Global 800/854-7179
Design by VMT